HDD for Water Pipe Installation: Efficient Trenchless Construction Solution

Publication Date: Jul 07, 2025

In urban construction and infrastructure upgrades, HDD for water pipe installation has become the preferred method for modern pipeline projects due to its efficiency and environmental benefits. This trenchless technology minimizes ground disturbance, making it ideal for installing water pipes under roads, rivers, and densely built areas.  

 135定向钻-1.jpg

1. Key Advantages of HDD for Water Pipe Installation  

(1) Eco-friendly: Eliminates large-scale excavation, preserving vegetation and structures  

(2) High efficiency: Achieves 50-100 meters of daily progress (depending on ground conditions)  

(3) Cost-saving: Reduces overall project costs by over 30% compared to traditional methods  

(4) Precision: Guidance systems ensure ±10cm installation accuracy  

 

2. Standard Construction Process  

(1) Site survey: Uses ground-penetrating radar to map underground utilities  

(2) Pilot drilling: Creates a φ100mm pilot hole along the designed path  

(3) Reaming: Progressively enlarges the hole to accommodate pipe diameter (up to φ700mm)  

(4) Pipe pulling: Connects HDPE/steel pipes to drill rods for single-pass installation  

 

3. Critical Equipment Specifications 

(1) Torque requirement: 3000N·m (for clay conditions)  

(2) Pull/push force: 100KN (ensures long-distance installation)  

(3) Mud system: Flow rate 100L/min, pressure 4MPa  

 

4. Recommended Equipment: Hengwang HWF135 HDD Rig

As a professional HDD for water pipe installation solution, the HWF135 features:  

(1) Power: 81kW Cummins engine for 200m continuous operation  

(2) Control: Dual-motor rotary head with 230r/min speed  

(3) Flexibility: Compatible with φ52-60mm drill rods (optional auto-rod handling)  

(4) Adaptability: Rubber tracks minimize ground damage  

 135定向钻-2.jpg

This model has successfully completed international HDD for water pipe installation projects including:  

(1) Southeast Asia urban water supply networks (180m single crossing)  

(2) Middle East desert pipeline projects (120m daily progress)  

 

Expert Tip: When selecting HDD for water pipe installation equipment, verify:  

(1) Contractor's experience with similar geology  

(2) Mud recycling/disposal capabilities  

(3) Manufacturer's technical support availability  

 

Hengwang Group provides comprehensive HDD for water pipe installation solutions encompassing equipment selection to operator training. For detailed technical specifications or project consultation, please leave your inquiry in our message center.

产品图1.jpg

Related News
Read More >>
Road Leveling Bulldozer: The Core Guarantee for Efficient Road ConstructionRoad Leveling Bulldozer: The Core Guarantee for Efficient Road Construction
Aug 04, 2025
The quality and efficiency of road construction largely depend on the road leveling process. And the road leveling bulldozer ​is the core equipment to ensure the efficient development of road leveling work. No matter what scale of road pro ...
Off-Road Forklifts_ A Powerful Assistant for Complex Field OperationsOff-Road Forklifts_ A Powerful Assistant for Complex Field Operations
Aug 02, 2025
In various field operations, off-road forklifts are indispensable equipment. Scenarios such as mining, forest logging, and field infrastructure construction all rely on the efficient material handling support of off-road forklifts. ...
High-Load Off-Road Forklift: A Powerful Tool for Heavy-Duty Operations in Complex EnvironmentsHigh-Load Off-Road Forklift: A Powerful Tool for Heavy-Duty Operations in Complex Environments
Aug 01, 2025
In non-paved scenarios such as construction sites, mines, and field logistics, the high-load off-road forklift is a core equipment for improving efficiency. Compared with ordinary forklifts, the high-load off-road forklift can not only handl ...
All products are guaranteed for 12 months!